by admin | Feb 23, 2022 | Pylons, Comms Towers, Transformers
ZINGA was applied as a unique system on some of the structures of the new power station in Arad in October 1999. This power station was built in co-operation with SIEMENS. The pictures were taken in September 2000. Gallery Download...
by admin | Feb 23, 2022 | Pylons, Comms Towers, Transformers
Application of ZINGA on 47 high tension pylons in Corten steel (type: Romcor Cichor) by contractor MUNTENIA NORD. These 47 pylons were highly corroded (see picture below). Gallery Download...
by admin | Feb 23, 2022 | Pylons, Comms Towers, Transformers
This is a testimonial letter from the company Energoproject of 27-05-1998, addressed to the Ministry of Electricity and Water concerning the advantages of the film galvanising system ZINGA not only for touch-ups of old hot-dip galvanisation but also for the treatment...
by admin | Feb 23, 2022 | Pylons, Comms Towers, Transformers
n 2006, the National Grid Company of the Philippines (named TRANSCO until 2009) used ZINGA to repair their old worn galvanised structures. More than 1000 kg of ZINGA was used on repairing high tension pylons within the Visayas region. Gallery Download...
by admin | Feb 23, 2022 | Pylons, Comms Towers, Transformers
In 1999 ZINGA was used to repair old hot-dipped structures at the Santa Rita 1000MW power plant and OHTL (OverHead Transmission Line) ranging from Santa Rita to Calaca (existing coalfired power plant). A total of 1,500 kg of ZINGA was used on this project. This power...
by admin | Feb 23, 2022 | Pylons, Comms Towers, Transformers
ENSA (part of group Distriluz) is a Peruvian company that is active in the electricity sector. Its market power in a geographic area of concession covers 139.63 km², in the regions of Lambayeque, Amazonas and part of Cajamarca. They serve more than 256,000...