Bordna Mona peat based power station had ongoing rust problems with the steel roof purlins in its drying sheds..resulting from extreme humidity.
All the purlins were shot blasted to SAE 2.5 prior to application of 120 um of ZINGA. ZINGA was specified as a galvanising system to protect all its new purlins to prevent corrosion. 525kg of ZINGA was used on this project.