ZINGA has been specified by the Saline Water Conversion Co. (SWCC) to be applied on steel structures of the 380 KV electrical bridge at their Shoaiba desalination plant. It consists of 3 pylons (40 meter high) and 2 bridges between them (each 20 meter long). The total...
In 2017 the Jeddah Islamic Port Authority decided to completely refurbish their 38-meter-high lighting masts which were severely corroded. The blasting and painting works were realized by the ZINGAMETALL Distributor of Saudi Arabia, B.P.C. (Building Products Company)....
In 2012, ZINGA was used to protect high tension pylons in Dammam (close to Bahrain). The customer, SAUDI ELECTRICITY COMPANY, selected ZINGA as the protection against corrosion in a coastal environment (close to the Arabian Gulf) to repair and recharge a hot-dip...
In 2017 ZINGA was applied on transformer’s radiators, its edges and corroded parts. It is the first application of ZINGA on such structures at the Saudi Electricity Company (National Grid). Gallery Download...
ZINGA was applied as a unique system on some of the structures of the new power station in Arad in October 1999. This power station was built in co-operation with SIEMENS. The pictures were taken in September 2000. Gallery Download...