ZINGA was applied on a highly corroded high tension power pylon of the electricity company FURNAS , in February 1999. The surface was manually prepared by metal brush, sand-paper and by degreasing with turpentine. Zingasolv was used to clean the brushes and to dilute...
In 1970, even before the creation of the ZINGAMETALL BV company, the Swiss ACMV steel company (Ateliers de Construction Mécaniques de Vevey), created in 1895, has built the structures for a bridge to be mounted on the R21 railway line, located in...
The AZEZA (Aqaba Special Economic Zone Authority) invested in a new photovoltaic plant near by the Amman Airport. The BELECTRIC GULF company, a subsidiary of BELECTRIC Solar & Battery Gmbh (Kolitzheim, Germany) obtained the order. BELECTRIC GULF decided to protect...
In February 2023 the METALYS company,specialist in blasting, metallizing and painting for 50years,located in Deinze, Belgium, applied a ZINGA duplex system on 10 frames for prefab walls for one of their clients. System: Surface preparation: Blasting to SA 2.5 Medium G...
The Mövenpick Hotel in Amman, Jordan, had some corrosion problems inside their big laundry machines. They first wanted to re-galvanize them. As the Hotel Management did not want to dismantle and take out all the laundry machine parts, their hotel equipment supplier,...
Recent Comments