In January 2021 the Team of ZINGA Sabah (East Malaysia) started to repair and replace corroded rebars which were spalling the concrete of the Kudat Port Jetty belonging to SABAH PORTS (SPSB),a wholly-owned subsidiary of Suria Capital Holdings Berhad. SABAH PORTS...
Some pictures of 2007 touch up work with ZINGA taken on an offshore platform at Sime Sembcorp Engineering Shipyard in Johor Bahru, Malaysia.This project concerns the YOHO ExxonMobil platform, for Nigeria. The YOHO field lies in Oil Mining Lease (OML) 104, offshore...
KILLYBEGS IMMERSED PIER LEGS Project Description The application of ZINGA on the pier legs at Killybegs Harbour was done in the summer of 2000. The customer, the Irish Department of Marine and Natural Resources, and the contractor, SAR Marine & General, waited a...
BANGOR PIER – IMMERSED PILES – IRELAND ZINGA was applied on immersed piles of a pier in the Bangor harbour. The piles were first UHP water-blasted and then gritblasted to give the correct surface profile. Then approx. 200 µm of ZINGA was applied in 4...
The Abadan and Shiraz Refineries are part of the IRAN NATIONAL OIL COMPANY. They have been constructed in the early 80’s. ZINGA was introduced to these complexes in 1993. Initially the existing structures had been painted or hot-dipped, therefore the main...